UPS Installation for SCC1 EPN A-Carrier Cabinet
Task List: Install UPS
SI Installation and Upgrades
789
June 2004
Figure 305: UPS for DS1 Remoted SCC1 EPN
Figure notes
1
110 cross-connect field
2
Utility fail wire pair
3
UPS fail wire pair
4
700A8 (RJ45) modular plug (see
Figure 303, Wiring the 700A8 Plug,
on
page 786 for wiring detail)
5
Z3A2 UPS alarm adapter plugs into
DB25 connector
6
UPS 800/1000VA
7
EPN control carrier
8
H600-348 DS1 converter cable
9
Channel service unit
10
See
Figure 306, Enlarged View of the
110 Cross-Connect Field for the AUX
Connector,
on page 790 for wiring
detail
2
1
5
6
7
8
4
3
9
10
AUX
EPN
Control carrier - J58890N
Port carrier - J58890H
Port carrier - J58890H
C
B
A
cydfups5 KLC 092899
6
5
2
1
6
7
8
1
2
3
4
5
6
7
9
10
8