E-4
channel and close the calibration wizard.
7. Replace the last measured standard with your DUT and perform calibrated measurements
without changing the channel settings used for calibration.
You can also access manual calibration from the
Measurement Wizard.
To perform an automatic calibration...
In the following example a 4-port TOSM calibration is performed using the calibration unit (option R&S
ZV-Z51). The calibration of other numbers of ports is analogous; see Performing an Automatic
Calibration.
Connect the calibration unit:
1. Switch on and start-up your network analyzer and establish a USB connection to the calibration
unit; see Connecting the calibration unit.
2. Connect ports 1 the unit to port 1 of the analyzer; repeat this for ports 2 to 4.
Perform the calibration:
3. Click
Channel – Calibration – Start Cal – Four Port P1 P2 P3 P4 – Calibration Unit
and wait
until the calibration is completed
.
If a message box
All test port connectors will be changed to
<Connector type>
pops up, confirm with
OK.
4. Remove the connecting cables from the unit, connect your DUT instead and perform calibrated
measurements.
You can also access automatic calibration from the
Measurement Wizard.
Summary of Contents for 1145.1010.04/05/06
Page 10: ......
Page 20: ......
Page 22: ......
Page 48: ......
Page 70: ......
Page 72: ......
Page 90: ......
Page 92: ......
Page 108: ......
Page 156: ......
Page 162: ......
Page 406: ...Display Menu R S ZVA ZVB ZVT 1145 1084 12 4 244 E 6 Stack Tile Horizontally Tile Vertically...
Page 450: ...Status Reporting System R S ZVA ZVB ZVT 1145 1084 12 5 18 E 1...
Page 462: ......
Page 766: ......
Page 772: ......
Page 792: ......
Page 794: ......
Page 808: ......