![Rohde & Schwarz 1145.1010.04/05/06 Operating Manual Download Page 55](http://html1.mh-extra.com/html/rohde-and-schwarz/1145-1010-04-05-06/1145-1010-04-05-06_operating-manual_1477759055.webp)
R&S
®
ZVB
Front Panel Tour
1145.1055.62 1.7
E-2
STEP SIZE opens an input box to select the steps (in units of the current physical
parameter) between two consecutive values if the rotary knob is turned to increase
or decrease numeric values. See
Data Entry
in Chapter 3.
STANDBY Key
The
STANDBY
toggle switch is located in the bottom left corner of the front panel.
The key serves two main purposes:
•
Toggle between standby and ready state
•
Shut down the instrument.
Test Ports
N-connectors, numbered 1 to 4 (for four-port instruments). The test ports serve as outputs for the RF
stimulus signal and as inputs for the measured RF signals from the DUT (response signals).
•
With a single test port, it is possible to generate a stimulus signal and measure the response signal
in reflection.
•
With 2, 3 or 4 test ports, it is possible to perform full two-port, 3-port or 4-port measurements; see
S-Parameters
section in Chapter 3.
Attention!
The maximum input levels at all test ports according to the front panel labeling or
the data sheet must not be exceeded.
In addition, the maximum input voltages of the other input connectors at the front
and rear panel must not be exceeded.
Summary of Contents for 1145.1010.04/05/06
Page 10: ......
Page 20: ......
Page 22: ......
Page 48: ......
Page 70: ......
Page 72: ......
Page 90: ......
Page 92: ......
Page 108: ......
Page 156: ......
Page 162: ......
Page 406: ...Display Menu R S ZVA ZVB ZVT 1145 1084 12 4 244 E 6 Stack Tile Horizontally Tile Vertically...
Page 450: ...Status Reporting System R S ZVA ZVB ZVT 1145 1084 12 5 18 E 1...
Page 462: ......
Page 766: ......
Page 772: ......
Page 792: ......
Page 794: ......
Page 808: ......