![Rohde & Schwarz 1145.1010.04/05/06 Operating Manual Download Page 346](http://html1.mh-extra.com/html/rohde-and-schwarz/1145-1010-04-05-06/1145-1010-04-05-06_operating-manual_1477759346.webp)
Channel Menu
R&S
®
ZVA/ZVB/ZVT
1145.1084.12 4.184
E-6
The different steps for deembedding and embedding are carried out in the following order:
This means that the real networks are removed before virtual networks are added. For a a single
balanced port with all (de-)embedding networks enabled, the 4 (de-)embedding steps are carried out in
the following order:
1. Initial situation: DUT embedded in 2-port and 4-port networks (only 1 port shown)
2. 2-port deembedding
3.
4-port deembedding
4. 4-port
embedding
5. 2-port
embedding
Reference Impedances...
Changes the reference impedances of the analyzer ports. This is often referred to as renormalization of
port impedances. Renormalization means that the measurement results measured at 50
(75 ) are
converted into results at arbitrary port impedance.
Summary of Contents for 1145.1010.04/05/06
Page 10: ......
Page 20: ......
Page 22: ......
Page 48: ......
Page 70: ......
Page 72: ......
Page 90: ......
Page 92: ......
Page 108: ......
Page 156: ......
Page 162: ......
Page 406: ...Display Menu R S ZVA ZVB ZVT 1145 1084 12 4 244 E 6 Stack Tile Horizontally Tile Vertically...
Page 450: ...Status Reporting System R S ZVA ZVB ZVT 1145 1084 12 5 18 E 1...
Page 462: ......
Page 766: ......
Page 772: ......
Page 792: ......
Page 794: ......
Page 808: ......