Operation
Precautions for use of the inverter
FR-E700 SC EC/ENE
4 - 5
Checking the inverter operating status by the inverter operation ready completion signal
Operation ready signal (RY signal) is output when the inverter power is on and the inverter becomes
operative. Check if the RY signal is output after powering on the inverter.
Checking the inverter operating status by the start signal input to the inverter and inverter
running signal
The inverter running signal (RUN signal) is output when the inverter is running (RUN signal is assigned
to terminal RUN in the initial setting).
Check if RUN signal is output when inputting the start signal to the inverter (forward signal is STF sig-
nal and reverse signal is STR signal). For logic check, note that RUN signal is output for the period from
the inverter decelerates until output to the motor is stopped, configure a sequence considering the
inverter deceleration time.
Checking the motor operating status by the start signal input to the inverter and inverter
output current detection signal
The output current detection signal (Y12 signal) is output when the inverter operates and currents
flows in the motor. Check if Y12 signal is output when inputting the start signal to the inverter (for-
ward signal is STF signal and reverse signal is STR signal).
Note that the current level at which Y12 signal is output is set to 150% of the inverter rated current in
the initial setting, it is necessary to adjust the level to around 20% using no load current of the motor
as reference with Pr. 150 "Output current detection level".
For logic check, as same as the inverter running signal (RUN signal), the inverter outputs for the period
from the inverter decelerates until output to the motor is stopped, configure a sequence considering
the inverter deceleration time.
I001878E
Fig. 4-3:
Ready status and motor running
Power supply
Output fr
equenc
y
Pr. 13 "Starting frequency"
DC injection
brake operation
Time
DC injection brake
operation point
ON
ON
ON
ON
ON
OFF
OFF
OFF
OFF
Reset processing
STF
RH
RY
RUN
Summary of Contents for fr-e700 series
Page 2: ......
Page 4: ......
Page 20: ...Contents XVI ...
Page 112: ...Operation panel Operation 4 20 ...
Page 154: ...External operation Basic settings 5 42 ...
Page 528: ...CC Link IE Field Network Basic Parameter 6 374 ...
Page 562: ...Meters and measuring methods Troubleshooting 7 34 ...
Page 606: ...A 30 Index Appendix ...
Page 607: ......