Wiring
Electromagnetic compatibility (EMC)
FR-E700 SC EC/ENE
3 - 49
쑶
●
Countermeasures
– Use Pr. 9 "Electronic thermal O/L relay".
– If the carrier frequency setting is high, decrease the Pr. 72 "PWM frequency selection" setting.
Note that motor noise increases. Selecting Pr. 240 "Soft-PWM operation selection" makes the
sound inoffensive. To ensure that the motor is protected against line-to-line leakage currents,
it is recommended to use a temperature sensor (e.g. PTC element) to directly detect motor
temperature.
●
Selecting a power supply circuit breaker:
You can also use a circuit breaker (MCCB) to protect the power supply lines against short circuits
and overloads. However, note that this does not protect the inverter (rectifiers, IGBT). Select the
capacity of the circuit breaker on the basis of the cross-sectional area of the power supply lines.
To calculate the required mains current trip point you need to know the power required by the
inverter (Refer to rated input capacity in Appendix A.1, Specifications) and the mains supply
voltage. Select a circuit breaker with a trip point that is slightly higher than calculated, particularly
in the case of breakers with electromagnetic tripping, since the trip characteristics are strongly
influenced by the harmonics in the power supply line.
Example
쑴
Line-to-line leakage current data example
Dedicated motor: SF-JR 4P
Carrier frequency: 14.5 kHz
Used wire: 2 mm², 4 cores, cab tyre cable
Motor Capacity [kW]
Rated Motor Current [A]
Leakage Currents [mA]
Wiring Length 50 m
Wiring Length 100 m
0.4
1.1
620
1000
0.75
1.9
680
1060
1.5
3.5
740
1120
2.2
4.1
800
1180
3.7
6.4
880
1260
5.5
9.7
980
1360
7.5
12.8
1070
1450
Tab. 3-23:
Line-to-line leakage current data example
I001043E
Fig. 3-43:
Line-to-line leakage currents
NOTE
The earth leakage breaker must be either a Mitsubishi earth leakage breaker (ELB, for harmonics
and surges) or an ELB with breaker designed for harmonic and surge suppression that is approved
for use with frequency inverters.
Power
supply
Inverter
Line-to-line
leakage currents
path
Line-to-line static
capacitances
M
3~
Thermal
relay
Motor
Summary of Contents for fr-e700 series
Page 2: ......
Page 4: ......
Page 20: ...Contents XVI ...
Page 112: ...Operation panel Operation 4 20 ...
Page 154: ...External operation Basic settings 5 42 ...
Page 528: ...CC Link IE Field Network Basic Parameter 6 374 ...
Page 562: ...Meters and measuring methods Troubleshooting 7 34 ...
Page 606: ...A 30 Index Appendix ...
Page 607: ......