Air Conditioning System: Manual Type 7B-34
f) Read stroke of armature plate from dial gauge by
performing step d) and e) repeatedly. (Stroke of
armature plate is clearance between armature
plate and magnet clutch pulley.)
Standard clearance between armature plate
and magnet clutch pulley:
0.3 – 0.5 mm (0.012 – 0.020 in.)
Thermal Switch Inspection
S6RW0C7216024
Measured thermal switch for resistance at 20
°
C (68
°
F)
Thermal switch resistance
Standard: 50 m
Ω
(DC 16 V, 5A at 20
°
C (68
°
F))
Thermal Switch Removal and Installation
S6RW0C7216025
Removal
1) Remove compressor from engine referring to
“Compressor Assembly Removal and Installation”.
2) Disconnect thermal switch connector.
3) Remove magnet clutch lead wire clamp.
4) Remove thermal switch (1) from compressor using
flat head (2).
Installation
Reverse removal procedure noting the following
instructions.
• Apply silicon sealant to contact face (2) of thermal
switch (1).
“A”: Silicon sealant 99000–34220 (SUZUKI
SILICON SEALANT KE-347W (100g))
• Install compressor to vehicle referring to “Compressor
Assembly Removal and Installation”.
• Evacuate and charge the A/C system referring to
“Evacuation” and “Charge” in “Operation Procedure
for Refrigerant Charge”.
2
1
3
I4RS0A720046-01
I7RW01721024-01
2
1
I5RS0C721011-01
3
2, “A”
1
I5RS0C721012-02
Summary of Contents for 2006 SX4
Page 2: ......
Page 6: ......
Page 22: ...00 15 Precautions...
Page 38: ...0B 7 Maintenance and Lubrication...
Page 378: ...1K 6 Exhaust System...
Page 848: ...6C 46 Power Assisted Steering System...
Page 954: ...7B 89 Air Conditioning System Automatic Type...
Page 1086: ...8B 121 Air Bag System...
Page 1381: ...Paint Coatings 9L 7 I5RW0C9C0005 01 A Apply sealant 1 Hole...
Page 1382: ...9L 8 Paint Coatings I5RW0C9C0006 01 A Apply sealant covering flange end...
Page 1476: ...Prepared by 1st Ed Feb 2007...