31.19
31 42
Installing leading link
•
Press the outer clamp sleeve flush into the
grooved ball bearing.
•
Chill the clamp sleeve and grooved ball bearing
down to at least -10 °C (14 °F).
•
Push the leading link on to the shoulder of the
spacing sleeve.
L
Note:
Extend the telescopic fork and press the suspen-
sion strut forwards.
•
Heat the frame to approx. 100 °C (212 °F) at the
right pivot bearing seat.
•
Coat the outside surface of the grooved ball
bearing with assembly grease.
•
Install angular-contact ball bearing and clamping
sleeve in frame, using
M 12 threaded rod,
BMW No. 31 5 691
,
M 12 nut with mount,
BMW No. 31 5 692
,
and puller sleeve,
BMW No. 31 5 697
,
by screwing the M 12 threaded rod into the lead-
ing link from the left.
L
Note:
The cutout on the pulling-in bushing must face out-
wards.
L
Note:
Pull clamping sleeve and spacing sleeve together
until gap is closed (arrow).
•
Tighten the leading link pivot mounts to the
frame.
L
Note:
Insert the bolt for the front suspension strut.
•
Tighten the leading link at the clamp sleeve.
X
Tightening torque:
Leading link to frame
(clean apply Loctite 243) .............. 107 Nm
Leading link to clamp sleeve ........................ 21 Nm
•
Route the wiring harness into the electronic
equipment box.
•
Secure the electronic equipment box and wiring
harness to the frame.
–
Install the Motronic control unit (
a
13.5).
•
Install the lid of the electronic equipment box.
•
Secure the leading link to the slider tube bridge,
and tighten.
•
Tighten the front suspension strut.
•
Secure the steering damper to the leading link,
and tighten.
•
Attach the front brake pipe to the fairing holder
and the slider tube bridge.
•
Secure the holder for the brake lines to the frame
at the front right.
•
Install the right-hand radiator.
–
Install the right air intake pipe (
a
46.17).
•
Detach the lifter,
BMW No. 00 1 510
, from the
sump.
–
Install holder for engine spoiler (
a
46.14).
–
Install engine spoiler (
a
46.14).
–
Install the fuel tank (
a
16.5).
e
Important:
Connect the positive battery terminal first, then the
negative terminal.
•
Connect the earth (ground) lead to the battery.
KR460390
31 5 697
31 5 691
31 5 692
w
h
100
KR460460
Summary of Contents for K 1200RS
Page 1: ...BMW Motorrad After Sales K 1200 RS Repair Manual ...
Page 11: ...00 2 Contents Page ...
Page 28: ...00 19 00 General view of crated motorcycle ...
Page 90: ...11 4 Contents Page ...
Page 137: ...12 2 Contents Page ...
Page 139: ...12 4 ...
Page 152: ...13 2 Contents Page ...
Page 154: ...13 4 ...
Page 171: ...16 2 Contents Page ...
Page 173: ...16 4 ...
Page 179: ...17 2 Contents Page ...
Page 181: ...17 4 ...
Page 182: ...17 5 Coolant circuit ...
Page 183: ...17 6 ...
Page 192: ...18 2 Contents Page ...
Page 194: ...18 4 ...
Page 198: ...21 2 Contents Page ...
Page 200: ...21 4 ...
Page 212: ...23 4 ...
Page 213: ...23 5 Gearbox cutaway drawing KR230000 ...
Page 214: ...23 6 ...
Page 239: ...31 2 Contents Page ...
Page 241: ...31 4 ...
Page 260: ...32 2 Contents Page ...
Page 262: ...32 4 ...
Page 271: ...33 2 Contents Page Installing rear swinging arm 24 Removing installing suspension strut 25 ...
Page 273: ...33 4 ...
Page 274: ...33 5 Rear wheel drive cutaway drawing KR330000 ...
Page 275: ...33 6 ...
Page 298: ...34 4 ...
Page 325: ...36 2 Contents Page ...
Page 327: ...36 4 ...
Page 338: ...46 4 ...
Page 339: ...46 5 General view of body panels K41469010 ...
Page 373: ...51 2 Contents Page ...
Page 378: ...52 2 Contents Page ...
Page 380: ...52 4 ...
Page 383: ...61 2 Contents Page Removing installing gear indicator 20 ...
Page 384: ...61 3 61 Technical Data K 1200 RS Circuit voltage V 12 Battery Amp h 19 ...
Page 385: ...61 4 ...
Page 387: ...61 6 Wiring harness View from right ...
Page 388: ...61 7 View from left ...
Page 389: ...61 8 View from front K41610010 ...
Page 403: ...62 2 Contents Page ...
Page 405: ...62 4 ...
Page 411: ...63 2 Contents Page ...
Page 413: ...63 4 ...