00.55
34 00
[Integral ABS] Replacing brake
fluid in the rear control circuit/bleeding
L
Note:
The rear wheel circuit and control circuit have a
shared expansion tank.
The wheel circuit must be filled with brake fluid.
•
Remove the cover (3) from the reservoir (4).
e
Attention:
During the process, do not permit the brake fluid le-
vel to drop below the hose level or else air will be
drawn into the brake system.
d
Warning:
If the brake-fluid level in the reservoir does fall below
hose level, the wheel circuit must be refilled at the
brake caliper and bled once again (
a
34.17).
L
Note:
Same procedure via other bleed screws as on front
control circuit, metering cylinder and integral
circuits.
d
Warning:
When performing maintenance and repair work on
the BMW Integral ABS, avoid rapid and forceful
pumping of the brakes.
•
In sequence, bleed the:
–
rear dosing cylinder (1),
–
rear integral circuit (2)
–
rear control circuit (3) and,
–
again, rear dosing cylinder (1)
bleed the system in accordance with instructions for
bleeding.
Regulations for bleeding:
1. Pull the brake lever slowly until the brake light
switch clicks (snifter hole closed).
2. Open the bleed screw.
3. Pull the brake lever fully and close the bleed
screw.
4. Release the brake lever slowly.
5. Repeat steps 1 to 4 until the brake fluid is clear
and has no bubbles.
Rear metering cylinder
•
Use special ring spanner
BMW No. 34 2 532
and connect silicon hose with brake bleeding
device to bleed screw (1), but
do not switch on
.
d
Warning:
When changing and bleeding the control circuit
brake fluid, do not use vacuum extraction.
•
Bleed system using the ring spanner,
BMW No. 34 2 532
, in accordance with
instructions for bleeding.
KR340571
3
1
4
MAX
MIN
MIN
MAX
F
R
2
4
KR340670
34 2 532
1
Summary of Contents for K 1200RS
Page 1: ...BMW Motorrad After Sales K 1200 RS Repair Manual ...
Page 11: ...00 2 Contents Page ...
Page 28: ...00 19 00 General view of crated motorcycle ...
Page 90: ...11 4 Contents Page ...
Page 137: ...12 2 Contents Page ...
Page 139: ...12 4 ...
Page 152: ...13 2 Contents Page ...
Page 154: ...13 4 ...
Page 171: ...16 2 Contents Page ...
Page 173: ...16 4 ...
Page 179: ...17 2 Contents Page ...
Page 181: ...17 4 ...
Page 182: ...17 5 Coolant circuit ...
Page 183: ...17 6 ...
Page 192: ...18 2 Contents Page ...
Page 194: ...18 4 ...
Page 198: ...21 2 Contents Page ...
Page 200: ...21 4 ...
Page 212: ...23 4 ...
Page 213: ...23 5 Gearbox cutaway drawing KR230000 ...
Page 214: ...23 6 ...
Page 239: ...31 2 Contents Page ...
Page 241: ...31 4 ...
Page 260: ...32 2 Contents Page ...
Page 262: ...32 4 ...
Page 271: ...33 2 Contents Page Installing rear swinging arm 24 Removing installing suspension strut 25 ...
Page 273: ...33 4 ...
Page 274: ...33 5 Rear wheel drive cutaway drawing KR330000 ...
Page 275: ...33 6 ...
Page 298: ...34 4 ...
Page 325: ...36 2 Contents Page ...
Page 327: ...36 4 ...
Page 338: ...46 4 ...
Page 339: ...46 5 General view of body panels K41469010 ...
Page 373: ...51 2 Contents Page ...
Page 378: ...52 2 Contents Page ...
Page 380: ...52 4 ...
Page 383: ...61 2 Contents Page Removing installing gear indicator 20 ...
Page 384: ...61 3 61 Technical Data K 1200 RS Circuit voltage V 12 Battery Amp h 19 ...
Page 385: ...61 4 ...
Page 387: ...61 6 Wiring harness View from right ...
Page 388: ...61 7 View from left ...
Page 389: ...61 8 View from front K41610010 ...
Page 403: ...62 2 Contents Page ...
Page 405: ...62 4 ...
Page 411: ...63 2 Contents Page ...
Page 413: ...63 4 ...