16-11
16.2 Processing Solution Replenishment System
16
4. Loosen the two screws and remove the pump
bracket.
5. Pinch the inlet and outlet hoses using the pinchcocks.
6. Cut the cord tie securing the outlet hose and
disconnect the hose from the pump.
7. Loosen the clamp and disconnect the inlet hose
from the pump.
8. Remove the screw and then pull out the pump.
9. Open the four clamps securing the pump harness.
Installation
Installation is essentially in the reverse order of removal.
NOTE: • Connect the hoses securely
• After installation, perform the following adjustment.
Menu 0620 "Pump Output Measurement/Setting"
LII699
Screws (2)
Pump Bracket
LII700
Pinchcocks (2)
Hoses (2)
Cord Tie
Clamp
Screw
Pump
LII1198
Clamps (4)