9-9
9.2 Image Processing Circuit Board Section
9
Removal
1. Remove the image processing circuit board box
2. Remove the two screws and then the box cover.
3. Remove the two screws and then the circuit board
holder.
Reinstallation
Reinstallation is essentially in the reverse order of
removal.
NOTE: Tighten the two screws while lightly pressing the
circuit board holder against the circuit boards.
Removal
1. Remove the box cover
2. Disconnect the connector from the GSR23 circuit
board.
9.2.2
Box Cover and Circuit Board Holder Removal/Reinstallation
Z
2
191
Box Cover
Screws (2)
Z
2
194
Screws (2)
Circuit Board Holder
9.2.3
GSR23 Circuit Board Replacement
Z
2
192
Connector
GSR23 Circuit Board