5-65
5.4 Scanner Adjustment/Maintenance (03)
5
On this menu, perform AD timing adjustment,
overflow voltage adjustment, DC offset adjustment
and gray pixel detection when the CCD unit has been
replaced.
[Selection]
[Setup and Maintenance]
→
[03 Scanner Adjustment/
Maintenance]
→
[0351 CCD Adjustment]
●
AD Timing Adjustment
1. Remove the carrier and install the 135 diffusion
box.
2. Click the [AD Timing Adjustment] button.
NOTE: FL TIMING: Feed through level timing (Black
level sampling)
DL TIMING: Data level timing (Data sampling)
5.4.17
CCD Adjustment (0351)
Z
2
035
135 Diffusion Box
Hole
Hole
Pin
Pin