17-4
17.1 Dryer Belt Unit
6. Remove the E-ring and then the gear.
7. Remove the E-ring and then the bearing.
8. Remove the E-ring, bearing and then the roller.
9. Remove the eight screws and then the two stays
and the mesh belt.
Installation
Installation is essentially in the reverse order of removal.
LII742
E-ring
E-ring
Bearing
Gear
LII743
E-ring
Bearing
Roller
LII744
Screws (8)
Stays (2)
Mesh Belt