2-12
2.3 Maintenance and Inspection Procedures
6. Set the nip rollers and wipe the feed rollers clean
with a cloth moistened with water while turning
the knob.
7. Wipe the scanning rollers clean with a cloth
moistened with water while feeding a sheet of
paper to turn them.
8. Reinstall the sub-scanning unit
.
Removal
1. Remove the sub-scanning unit
.
2. Remove the frame from the sub-scanning unit
.
3. Remove the three screws and then the timing belt
cover.
L
2
935
Knob
Feed Rollers
L
2
936
Paper
Cotton Swab
Scanning Rollers
2.3.16 Cam Follower (Rubber Bearing) Replacement
L
2
436
Screws (3)
Timing Belt Cover