11-54
11.3 Registration Section
Removal
1. Remove the two entrance guide plates (upper and
lower)
2. Remove the two coil springs.
3. Remove the E-ring and then the roller/bracket by
pulling the shaft out.
4. Remove the two E-rings, two bearings and then
the roller.
Installation
Installation is essentially in the reverse order of removal.
11.3.17
Registration Section Nip Roller 1 Replacement
LII143
Springs (2)
E-ring
Shaft
Roller/Bracket
LII086
E-rings (2)
Bearings (2)
Roller