13-43
13.2 Distribution Unit
13
5. Release the locking tab and remove the gear.
6. Remove the bearing.
7. Remove the E-ring and then the bearing from the
roller shaft.
8. Remove the roller.
Installation
Installation is essentially in the reverse order of removal.
NOTE: Insert sheets of glossy paper (0.2 to 0.3 mm
thickness) between the guide plate and the
distribution side feed roller and tighten the four
screws. Make sure that sheets of paper have slight
resistance against removal.
LII570
Gear
Bearing
Roller
Bearing
E-ring
LII571
Glossy Paper (0.2 to 0.3 mm)
Distribution Side Feed Roller
Guide Plate
Screws (4)