5-15
5.2 System Operation Setup and Check (01)
5
This procedure sets the installation information.
After setting up, restart the system to activate the new
settings.
[Selection]
[Setup and Maintenance]
→
[01 System Operation
Setup and Check]
→
[0140 Installation Information
Setup]
1. Set the delivery date, startup date and lab ID.
2. Click the [Option] button.
3. Select “Not used” or “COM1” for “PU800BA”.
4. Select “Not used” or “COM3” to “COM6” for “Bar-
code Reader”.
5. Select “YES” or “NO” for “External File I/O”.
6. Click the [OK] button.
• The dialog box disappears.
7. Click the [OK] button.
• The dialog box appears.
8. Click the [OK] button.
• Operation returns to the menu screen.
9. Perform the post-operational checks to shut down
the system and then restart the system.
• The new settings are activated.
5.2.11
Installation Information Setup (0140)