14-11
14.2 Processing Racks
14
9. Remove the four screws and then the turn guide.
10. Remove the PPE roller and two black soft rollers.
11. Remove the inlet, outlet upper and lower guide
plates by releasing their locking tabs.
12. Remove the remaining 12 rollers.
Installation
Installation is essentially in the reverse order of removal.
NOTE: • Check the locking tabs of guide plates are locked
securely by moving each guide plate back forth.
• Install the rollers and coil springs in the proper
position as shown
LII595
Screws (4)
Turn Guide
PPE Roller
Black Soft Rollers (2)
LII589
Locking Tab
Entrance Guide Plate (2)