7-88
7.5 Multi-film Carrier MFC10AY (Optional)
Installation
Installation is essentially in the reverse order of
removal.
NOTE: Engage the gears so that the D-flat surface of the
upper gear shaft faces to the direction shown in the
figure when the pin of the idler gear is moved up
fully along the groove.
Removal
1. Remove the CYB circuit board cover
2. Remove the screw securing the harness clamp.
3. Remove the two screws securing the grounding
wires.
4. Disconnect the CYB1 and CYB2 connectors.
5. Remove the screw and then the plug-in connector
cover.
6. Remove the two screws and then the plug-in
connector.
Installation
Installation is essentially in the reverse order of
removal.
Z
2
415
D-flat Surface of
Upper Gear
Shaft
Idler Gear
Upper Gear
Pin on Idler Gear
7.5.8
Plug-in Connector Replacement
Z
2
416
Screws/Grounding
Wires (2)
Screw/Clamp
CYB1
Connector
CYB2
Connector
Z
2
417
Screws (2)
Screw
Plug-in Connector
Plug-in Connector Cover