Maintenance-Object Repair Procedures
555-233-143
8-158
Issue 1 May 2002
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the following tables when
inspecting errors in the system. For example, by clearing error codes associated
with the ASAI Port Local LAN Looparound test (#618), you may also clear errors
generated from other tests in the testing sequence.
BRI Port Local LAN Loop-Around Test (#618)
This test is destructive.
This test verifies the connectivity of a BRI port across the LAN Bus and executes
only if the port is out-of-service. The test aborts if calls associated with the port
are in-progress. Failures of this test indicate either on-board faults associated
with the ASAI-PT hardware on the circuit pack or problems with the LAN Bus,
which is used to form connectivity between the switch and the ASAI-PT.
The dotted lines in
show how a loop-around test is
performed across the packet bus for the D channel.
Table 8-60.
System Technician-Demanded Tests: ASAI-PT
Order of Investigation
Short Test
Sequence
Long Test
Sequence
D/ND
1
1.
D = Destructive, ND = Nondestructive
ASAI Port Local LAN Looparound test (#618)
X
D
Level 1 Status Inquiry test (#621)
X
X
ND
CRC Error Counter test (#623)
X
ND
Layer 1 Transmission Error Counter test (#624)
X
ND
Receive FIFO Overflow Error Counter test (#625)
X
ND
Clear Error Counters (#270)
X
X
ND
Continued on next page
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...