Maintenance-Object Repair Procedures
555-233-143
8-780
Issue 1 May 2002
5. Replace faulty components and reconnect the original fiber. Be sure to
reconnect the fibers properly as noted in step 3. If there is a problem with
the port network after re-connecting the fiber, and the port network is
connected to a Center Stage Switch, run the Configuration Audit via the
test board command on the SNI circuit pack to which the intervening fiber
is connected. See the SNI-BD section for instructions on interpreting
results.
6. Release EI circuit pack or SNI circuit pack with the release board UUCSS
command.
Figure 8-39.
Interconnection of Lightwave Transceiver Transmit/Receive Jacks
Tx
Rx
Transceiver
Lightwave
Back Skin of Cabinet
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...