![Avaya S8700 Series Maintenance Manual Download Page 2047](http://html1.mh-extra.com/html/avaya/s8700-series/s8700-series_maintenance-manual_30271022047.webp)
PPP-PT (Control LAN Packet/Port)
Issue 1 May 2002
8-1325
555-233-143
FAIL
PPP link is down.
1. Test the port (test port UUCSSpp long) to verify the SCOTCH
Synchronous Local Loop Around test (#1275) result.
2. If the test passes, wait for sessions to come up.
3. If the test fails, check the destination and other components in the path
(e.g., DS1 trunks).
4. If the destination and other components in the path are in-service and the
test still fails, execute busyout port UUCSSpp and release port
UCCSSpp, and repeat the test.
5. If the test still fails, reset the circuit pack (busyout board UUCSS, reset
board UUCSS, and release board UUCSS). Repeat the test.
6. If the problem persists, replace the circuit pack.
PASS
PPP link is up.
Table 8-533.
Test #1279 PPP Link Status Inquiry Test —
Continued
Error
Code
Test
Result
Description / Recommendation
Continued on next page
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...