Maintenance-Object Repair Procedures
555-233-143
8-1428
Issue 1 May 2002
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when inspecting
errors in the system. For example, by clearing error codes associated with the
Configuration audit (#759), you may also clear errors generated from other tests
in the testing sequence.
See
‘‘SNC-BD (Switch Node Clock Circuit Pack)’’ on page 8-1384
for descriptions
of tests and results.
Order of Investigation
Short Test
Sequence
Long Test
Sequence
Reset Board
Sequence
D/ND
1
1.
D = Destructive, ND = Nondestructive
Configuration audit (#759)
X
X
ND
Failure audit (#777)
X
X
ND
Processor Route audit (#760)
X
ND
SNC On-Board test (#778)
X
X
ND
TPN test (#779)
X
X
ND
Switch Node Clock Reset test (#780)
X
D
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...