Maintenance-Object Repair Procedures
555-233-143
8-188
Issue 1 May 2002
Replacing an ATM-EI Circuit Pack
Standard Reliability
1. Enter busyout atm pnc # (this is service-affecting) at the SAT.
2. Replace the ATM PNC circuit pack, and reconnect the fiber.
3. Enter release atm pnc.
4. Wait 2½ minutes for board insertion.
5. Enter list sys-link to verify that the links are up.
6. Enter test board UUCSS, and verify that every test passes.
Duplex or High Reliability
There is 1 ATM-EI circuit pack in each EPN.
1. Enter busyout atm pnc # at the SAT.
NOTE:
If the ATM-EI is in an EPN, this is service-affecting.
2. Replace the circuit pack.
3. Enter release atm pnc.
4. Wait 2½ minutes for board insertion.
5. Enter list sys-link to verify that the links are up.
6. Enter test board UUCSS, and verify that every test passes.
Critical Reliability
There are 2 ATM-EI circuit packs in each EPN.
1. Enter status pnc at the SAT. If the board is on the active side, enter reset
pnc interchange to switch the active ATM-EI board to the standby side.
2. Enter busyout pnc-standby.
3. Enter busyout atm pnc # a-pnc or b-pnc.
4. Replace the circuit pack.
5. Enter release atm pnc #.
6. Enter release pnc-standby.
7. Wait 2½ minutes for board insertion.
8. Enter test board UUCSS, and verify that every test passes.
Summary of Contents for S8700 Series
Page 50: ...Maintenance Architecture 555 233 143 1 26 Issue 1 May 2002 ...
Page 74: ...Initialization and Recovery 555 233 143 3 12 Issue 1 May 2002 ...
Page 186: ...Alarms Errors and Troubleshooting 555 233 143 4 112 Issue 1 May 2002 ...
Page 232: ...Additional Maintenance Procedures 555 233 143 5 46 Issue 1 May 2002 ...
Page 635: ...status psa Issue 1 May 2002 7 379 555 233 143 status psa See status tti on page 7 406 ...
Page 722: ...Maintenance Commands 555 233 143 7 466 Issue 1 May 2002 ...