Installation
1MAN0158-H11 04-2005 CSIP Level 1
CardioMD Service Manual
8-23
31.
Protect cables on the floor.
32.
Perform local area network and DICOM setup.
33.
Configure regional settings, institution name and units for patient height and weight.
34.
Set up hardcopy printer.
35.
Verify proper operation and detector performance.
36.
Recalibrate detector if found required when checking performance (see Chapter 4
Calibration
).
37.
Acquire customer requested uniformity correction tables, etc.
8.3.2
Tools
8.3.2.1
Tools Shipped with System
•
2 dolly wheel bars
•
2 jack beams
•
4 plastic protection feet
•
4 socket head cap screws M12
×
75 mm
•
1 rectangular plywood plate (plate for trolley) 24
×
24 inch (60 cm
×
60 cm)
•
1 ½” ratchet
•
1 leveling tool (special screw driver for the leveling screws)
•
2 M10
×
200 mm long bolts
•
1pcs 15 mm masonry drill.
8.3.2.2
Tools not Shipped with System
•
Pallet Jack
•
Spirit level with tol/– 0.05°
•
Hammer drill
•
Metric Allen keys, 1.5 through 10 mm
•
3/8" drill with Phillips heads bit (used for disassembling shipping containers)
•
Phillips screwdriver
•
3 mm standard screwdriver
•
A set of Torx keys in the range of T6 – T25
•
Wrenches: 16 mm, 17 mm and 19 mm
•
Mandrel used to set the anchors.
Summary of Contents for CARDIOMD
Page 1: ...CARDIOMD SERVICE MANUAL 1MAN0158 H11 04 2005 CSIP Level 1 ...
Page 10: ...Introduction x CardioMD Service Manual 1MAN0158 H11 04 2005 CSIP Level 1 ...
Page 16: ...Safe Operating Practices 1 6 CardioMD Service Manual 1MAN0158 H11 04 2005 CSIP Level 1 ...
Page 164: ...Detector Calibration Files 5 60 CardioMD Service Manual 1MAN0158 H11 04 2005 CSIP Level 1 ...
Page 328: ...Installation Procedures 9 38 CardioMD Service Manual 1MAN0158 H11 04 2005 CSIP Level 1 ...
Page 348: ...Planned Maintenance Procedures 11 6 CardioMD Service Manual 1MAN0158 H11 04 2005 CSIP Level 1 ...
Page 465: ......