![EXFO Power Blazer 88200NGE User Manual Download Page 91](http://html1.mh-extra.com/html/exfo/power-blazer-88200nge/power-blazer-88200nge_user-manual_2449938091.webp)
Test Setup - Test Applications
Power Blazer
81
TCP Throughput
TCP Throughput
The objective of this test is to find the TCP throughput based on the
successfully transported bytes over the test time. Two units running a TCP
Throughput test are required. One unit will act as the source (Local) and
the other one as the destination (Remote).
The local unit starts sending TCP segments using the Initial Window Size
defined. The window size is adjusted following the TCP algorithm. The
window size is incremented until the Maximum Window Size or
congestion is reached. However, the window size will be reduced when
congestion occurs, then incremented again as described above when the
congestion is cleared. TCP Throughput and windows size statistics will be
gathered throughout the test.
Typical TCP Throughput test application:
Supported Interfaces/Rates: 10M to 1G.
Network
under test
Local Testing Unit
Remote Unit
EXFO Unit
EXFO Unit
Summary of Contents for Power Blazer 88200NGE
Page 1: ...www EXFO com User Guide 88000 Series Power Blazer HIGH SPEED MULTISERVICE TEST MODULE...
Page 14: ......
Page 20: ......
Page 64: ...Test Setup Test Applications 54 88000 Series OTN BERT...
Page 71: ...Test Setup Test Applications Power Blazer 61 SONET SDH BERT For SDH BERT...
Page 76: ...Test Setup Test Applications 66 88000 Series SONET SDH DSn PDH BERT For SDH...
Page 620: ......
Page 726: ......
Page 752: ......
Page 756: ......
Page 768: ......
Page 886: ...0 5 1 5 48 5 0 176 W d y K y K D...