![EXFO Power Blazer 88200NGE User Manual Download Page 170](http://html1.mh-extra.com/html/exfo/power-blazer-88200nge/power-blazer-88200nge_user-manual_2449938170.webp)
Test Setup - Test Configurator, Timer, and System
160
88000 Series
BERT and Unframed BERT
Note:
The Service Disruption Time measurement supports a parent defect
approach where the SDT measurement is triggered when the selected
defect or a higher defect in the signal structure hierarchy is detected. For
example, if Bit Error is selected, an OPU AIS error will trigger an SDT event.
No Defect Time (ms)
represents the period without any defects before
stopping SDT measurement:
0.005 ms
to
2000 ms
(default is
300 ms
).
Disruption Monitoring
check box when selected (disabled by
default) enables the disruption time measurements. However, the
measurement will only start if the test is already started, or when the
test will be started.
Note:
Clearing the
Disruption Monitoring
check box will stop the measurement
without clearing the results. The disruption monitoring is automatically
stopped without clearing results when the test is stopped. However, starting
the test again while the
Disruption Monitoring
check box is selected will
reset the results before restarting.
Pass/Fail Verdict
check box when selected (cleared by default)
enables service disruption pass/fail verdict and allows setting the
threshold value.
SDT Threshold (ms)
allows entering the SDT threshold value that will
be used to declare the pass/fail verdict:
0.001
to
299999.999 ms
(default is
50
ms). For EtherBERT, the minimum value is adjusted with
respect to the
No Traffic Time
.
Multi-Pattern Configuration
Note:
Only available for
DSN/PDH BERT
test application with DS1 signal (DS0
disabled) and when the pattern is
Multi-Pattern
.
This feature allows sending each pattern for a specific duration,
sequentially and continuously.
Summary of Contents for Power Blazer 88200NGE
Page 1: ...www EXFO com User Guide 88000 Series Power Blazer HIGH SPEED MULTISERVICE TEST MODULE...
Page 14: ......
Page 20: ......
Page 64: ...Test Setup Test Applications 54 88000 Series OTN BERT...
Page 71: ...Test Setup Test Applications Power Blazer 61 SONET SDH BERT For SDH BERT...
Page 76: ...Test Setup Test Applications 66 88000 Series SONET SDH DSn PDH BERT For SDH...
Page 620: ......
Page 726: ......
Page 752: ......
Page 756: ......
Page 768: ......
Page 886: ...0 5 1 5 48 5 0 176 W d y K y K D...