1
Performing Routine Maintenance
Cleaning the Ion Source Cartridge
Thermo Scientific
ISQ 7000 Hardware Manual
53
7. Push the handle down and then twist the top of it in the opposite direction to lock it into
place.
8. Pull the handle up to open the interior ball valve.
Figure 36.
Pulling Down the Vacuum Interlock Handle
Note
If more than 60 seconds have passed since the
Ready to Open
light turned on, the
Ready to Open
light will turn off. You should press the
Evacuate
button and wait until
the
Ready to Open
light is lit again.
Содержание ISQ 7000
Страница 1: ...ISQ 7000 Mass Spectrometers Hardware Manual 1R120617 0002 Revision C December 2018 ...
Страница 8: ......
Страница 174: ...2 Troubleshooting Contacting Technical Support 146 ISQ 7000 Hardware Manual Thermo Scientific ...
Страница 400: ...3 Advanced Maintenance Replacing Fans and Filters 372 ISQ 7000 Hardware Manual Thermo Scientific ...