1
Performing Routine Maintenance
Replacing a Column
18
ISQ 7000 Hardware Manual
Thermo Scientific
To connect the column using the spring loaded transfer line nut
1. Lower the oven temperature and allow it to cool.
2. If the ISQ 7000 system is running, shut down and vent it. See the instrument’s hardware
manual for instructions.
3. Unwind about one turn of the column from the column outlet end.
4. Wipe approximately 300 mm (12 in.) of the column with a tissue soaked in methanol.
5. Choose an appropriate ferrule for the outer diameter of your column.
6. Insert the column through the spring loaded transfer line nut and ferrule, entering
through the tapered end of the ferrule.
7. Wipe the column again with a tissue soaked in methanol.
Note
If you use a graphite Vespel ferrule with your column, Thermo Fisher Scientific
recommends using the spring loaded transfer line nut with it. See the spare parts guide for
ordering information.
CAUTION BURN HAZARD:
The injector, detectors, oven, and transfer line may be hot.
Allow them to cool before touching them.
ATTENTION RISQUE DE BRÛLURE :
l’injecteur, les détecteurs, le four et la ligne de transfert
peuvent être chauds. Laissez-les refroidir avant de les toucher.
Note
Wear clean, lint- and powder-free gloves when you handle the column and
transfer line ferrule.
Содержание ISQ 7000
Страница 1: ...ISQ 7000 Mass Spectrometers Hardware Manual 1R120617 0002 Revision C December 2018 ...
Страница 8: ......
Страница 174: ...2 Troubleshooting Contacting Technical Support 146 ISQ 7000 Hardware Manual Thermo Scientific ...
Страница 400: ...3 Advanced Maintenance Replacing Fans and Filters 372 ISQ 7000 Hardware Manual Thermo Scientific ...