1
Performing Routine Maintenance
Replacing a Column
Thermo Scientific
ISQ 7000 Hardware Manual
21
16. Loosen the transfer line nut from the column measuring tool.
17. Remove the column, transfer line nut and ferrule from the column measuring tool,
making sure not to move the septum from its location on the column.
18. Insert the column into the transfer line.
Figure 12.
Inserting the Column into the Transfer Line
19. Tighten the spring loaded transfer line nut until it is just secure enough so that you
cannot move it.
20. Loosen the nut by turning it exactly 1 flat (60°) backward.
21. Position the column in the transfer line using the cut septum to measure the correct
length you should insert the column.
Note
The ferrule should still be able to move on the column. Use the septum to mark the
correct location where the column should exit the nut.
Transfer Line
Column
Spring Loaded
Transfer Line Nut
Septum
Содержание ISQ 7000
Страница 1: ...ISQ 7000 Mass Spectrometers Hardware Manual 1R120617 0002 Revision C December 2018 ...
Страница 8: ......
Страница 174: ...2 Troubleshooting Contacting Technical Support 146 ISQ 7000 Hardware Manual Thermo Scientific ...
Страница 400: ...3 Advanced Maintenance Replacing Fans and Filters 372 ISQ 7000 Hardware Manual Thermo Scientific ...