3
Advanced Maintenance
Replacing the Calibration Gas Components
358
ISQ 7000 Hardware Manual
Thermo Scientific
14. Pull the tubing out through the access hole in the interior front panel.
15. Disconnect the P1 and P2 electrical wires from the front of the calibration gas module.
16. Use a 5/16 in. wrench to disconnect the stainless steel tubing.
17. Use a T20 Torxhead screwdriver to remove the two screws holding the module
to the
interior front panel. The tubing will come off with it.
18. Remove the calibration gas controller from the front panel and attach a new one.
19. Reattach the two screws that connect the new calibration gas module to the interior front
panel.
Figure 403.
Disconnecting the Calibration Gas Module
Note
If you are using CI, you will have P1 and P2 electrical wires.
Note
If you have a single-level calibration gas module, your ISQ 7000 instrument only
has a P1 connector.
Note
The calibrant reservoir on the new calibration gas module is not filled with
calibrant. Fill the new calibrant reservoir by following the instructions in
Foreline
Pump
Tubing
Access
P1 and P2
Electrical
Wires
Calibration
Gas
Module
Stainless
Steel
Tubing
Connector
Screws
Содержание ISQ 7000
Страница 1: ...ISQ 7000 Mass Spectrometers Hardware Manual 1R120617 0002 Revision C December 2018 ...
Страница 8: ......
Страница 174: ...2 Troubleshooting Contacting Technical Support 146 ISQ 7000 Hardware Manual Thermo Scientific ...
Страница 400: ...3 Advanced Maintenance Replacing Fans and Filters 372 ISQ 7000 Hardware Manual Thermo Scientific ...