3
Advanced Maintenance
Replacing the Calibration Gas Components
368
ISQ 7000 Hardware Manual
Thermo Scientific
16. Reconnect the two connectors on each side of the transfer line.
17. Replace the glass manifold cover.
18. Slide the right side panel back onto the instrument and reattach the screws.
19. Replace the top cover and tighten the screws.
20. Reposition the instrument closer to the GC.
21. Restart your system by following the instructions in
Note
Be careful when mounting the new transfer line. Ensure the glass braid insulation
protects the wires from being pinched and shorted to the metal of the transfer line.
Figure 419.
Reconnecting the Transfer Line Tubing
Connectors
Содержание ISQ 7000
Страница 1: ...ISQ 7000 Mass Spectrometers Hardware Manual 1R120617 0002 Revision C December 2018 ...
Страница 8: ......
Страница 174: ...2 Troubleshooting Contacting Technical Support 146 ISQ 7000 Hardware Manual Thermo Scientific ...
Страница 400: ...3 Advanced Maintenance Replacing Fans and Filters 372 ISQ 7000 Hardware Manual Thermo Scientific ...