Mounting
4.2 Mounting modules
IO-Link I/O modules
System Manual, 08/2021, A5E48755395-AB
23
Fastening for cable ties
All IO-Link I/O modules have integrated fastening points for cable ties. The fastening points
are found on all four corners of the modules.
The figure below shows the top left fastening point for 2.5 mm cable ties for fastening the
cables.
Figure 4-4
Top left fastening point for cable ties
Summary of Contents for SIMATIC ET 200AL
Page 2: ......
Page 143: ......
Page 218: ......
Page 250: ......
Page 296: ......
Page 337: ......
Page 365: ......
Page 392: ......
Page 419: ......
Page 451: ......
Page 483: ......
Page 597: ......
Page 648: ......
Page 702: ......
Page 739: ......
Page 781: ......
Page 804: ......
Page 828: ......
Page 853: ......
Page 880: ......
Page 906: ......
Page 996: ...Diagnostics ...
Page 1121: ......
Page 1565: ......