![background image](http://html1.mh-extra.com/html/omron/cs1w-213-rev-02-2008/cs1w-213-rev-02-2008_operation-manual_742355226.webp)
201
Positioning Sequences
Section 8-4
sequence #50 designated, positioning will be carried out using the position
data set for position #50. This positioning sequence can be used again with
only the position changed, and with the other data settings left unchanged.
8-4-1
Sequence Format
Each positioning sequence is configured of three words, as shown below. Up
to 100 of these sequences can be set for each axis, and transferred to the
PCU and saved.
The data that is used when performing memory operation using positioning
sequences is as follows.
One Axis Operation
• The data (dwell time, acceleration time, deceleration time, initial speed,
target speed) for the starting axis (the axes from which memory operation
is started) is used.
• The acceleration/deceleration curve set for the axis specified by the axis
designation will be used.
• The position set for the axis specified by the axis designation will be used.
• The initial pulse designation for the axis specified by the axis designation
will be used.
Operation for Two Axes or More
• The data (dwell time, acceleration time, deceleration time, initial speed,
target speed) for the starting axis is used.
• Out of the acceleration/deceleration curves set for the axes specified by
the axis designation, the curve for the axis with the highest priority will be
used. The X axis has the highest priority and the U axis has the lowest.
• The positions set for the axes specified by the axis designation will be
used.
• Out of the initial pulse designations for the axes specified by the axis des-
ignation, the slowest will be used.
The data that is used in 1-axis operation and 2-axis operation is shown in the
following table.
15
00
Axis designation
Output code
Position designation
Completion code
12 11
08 07
04 03
Dwell time number
Accel. time number
Decel. time number
Initial speed number
Target speed number
Summary of Contents for CS1W-213 - REV 02-2008
Page 2: ...CS1W NC113 213 413 133 233 433 Position Control Units Operation Manual Revised February 2008 ...
Page 3: ...iv ...
Page 13: ...xiv ...
Page 15: ...xvi ...
Page 19: ...xx ...
Page 43: ...18 Basic Operational Flow Section 2 1 ...
Page 87: ...62 Servo Relay Unit Section 3 7 ...
Page 199: ...174 Z phase Margin Section 6 8 ...
Page 217: ...192 Sample Program Section 7 7 ...
Page 285: ...260 Easy Backup Function Ver 2 0 or later Section 9 11 ...
Page 377: ...352 Common Parameter Area Appendix C ...