Official GSK Agents in South Africa
Tel: +27 11 626 2720, [email protected]
GSK980TDi Turning CNC System User Manual
402
Ⅲ
Connection
Fig. 2-45A
SAR, SALM signal input circuit is shown in Fig.2-45B:
Fig.2-45B
z
Operation sequence
(
defined by standard PLC program
)
Spindle operation sequence is show in Fig 2-46:
Fig. 2-46 spindle rotation(CW/CCW) sequence
Note: T2 is the delay time from sending the spindle stop signal to sending the spindle brake signal; T3 is the
spindle brake hold time.
z
Function description
(
defined by standard PLC program
)
①
After the CNC is turned on, when M05 output is valid, M03 or M04 is executed, M03 or M04
output is valid and remains, at the time, M05 output is closed; when M03 or M04 output is valid, M05
is executed, M03 or M04 is closed, M05 output is valid and remains; the spindle brake SPZD signal
output delay is set by No.087
(
delay time from the spindle stop signal output to the spindle brake
SPZD signal output
)
, the hold time of the brake signal is set by No. 089
(
the spindle brake output
time
)
.
②
When M03
(
M04
)
output is valid, M04
(
M03
)
is executed, the alarm occurs.
③
When
№
175.6 is set to 1, the system checks whether the speed arrival signal SAR is valid, if
it is valid, the system normally runs, if not, “Check speed arrival……” is displayed.
④
When the spindle speed command and the cutting feed command are in the same block, the
system executes the delay check for SAR signal to avoid that the CNC starts the cutting based on the
last spindle speed arrival signal SAR, the delay time is set by No.072.
⑤
DC00 is the spindle zero-speed output range. When the actual spindle speed is not more
CNC
side
Machine side
Output signal
CW/CCW
T3
T2
Brake
Stop
Stop signal