Official GSK Agents in South Africa
Tel: +27 11 626 2720, [email protected]
Chapter 7 Tool Offset & Setting
293
Ⅱ
Operation
value is input in the tool offset page; the system counts the new tool offset value and sets it
to the selected tool offset number according to the input value and the previous recorded
absolute coordinates.
Use the following methods to clear the recorded coordinates when the above methods are used
to execute the tool-setting:
1) In the tool offset page, after the absolute coordinates are input in some tool offset(for
example: Z0 is input in the No.01 tool offset number) and then the axis moves, the recorded
coordinates are cleared;
2) Press
or
or
in the tool offset page and the recorded coordinates are
cleared.
3)
7.5 Setting & Altering an Offset Value
Refer to Section 1.3.3 about methods of entering the offset setting page.
7.5.1 Offset Setting
1) Press
key to enter the offset setting page, select the desired window by pressing the
,
;
2) Move the cursor to the location of the tool offset, wear number to be input.
Scanning: Press
,
to move the cursor in sequent
Searching: use the following press keys to directly move the cursor to the input position:
Press
+ offset
or
and input the offset number in the
pop-up dialogue box, press
and the cursor directly positions the target offset
number.
3) Numerical value input.
Method 1: Input number after pressing the address button (the corresponding axis name
button for the
,
, etc.);
Method 2: Input number after pressing the
soft button;
3) Press
and the CNC calculates the offset value automatically and displays the result in
the window. Its range:-9999.999~9999.999
(
IS_B
)
/-9999.9999~9999.9999
(
IS_C
)
(unit
:
mm)
7.5.2 Offset Alteration
1) Refer to OPERATION, Section 7.5.1, and move the cursor to the location of the offset
number that is to be altered;