Official GSK Agents in South Africa
Tel: +27 11 626 2720, [email protected]
Chapter 1 Programming
15
Ⅰ
Programming
command and there may be different meaning in the same command address when the different
words are combined together. All words of GSK980TDi are in Table 1-2.
Table 1-2 Word table
Address
Command value range
Function meaning
Unit
O
0
~
9999
Program name
N
0
~
9999
Block number
G
00
~
99
Preparatory function
-99999999
~
99999999
X coordinate
Relevant to IS-B, IS-C
X
0
~
99999.999(s)
Pause time
Z
-99999999
~
99999999
Z coordinate
Relevant to IS-B, IS-C
Y
-99999999
~
99999999
Y coordinate
Relevant to IS-B, IS-C
-99999999
~
99999999
X increment
Relevant to IS-B, IS-C
0
~
99999.999(s)
Pause time
-99999
~
99999
X finishing allowance in G71,G72,
G73
Relevant to IS-B, IS-C
1
~
99999
Cutting depth in G71
Relevant to IS-B, IS-C
U
-99999999
~
99999999
X tool retraction clearance in G73
Relevant to IS-B, IS-C
-99999999
~
99999999
Z increment
Relevant to IS-B, IS-C
1
~
99999
Cutting depth in G72
Relevant to IS-B, IS-C
-99999
~
99999
Z finishing allowance in G71,G72,
G73
Relevant to IS-B, IS-C
W
-99999999
~
99999999
Z tool retraction in G73
Relevant to IS-B, IS-C
V
-99999999
~
99999999
Y increment
Relevant to IS-B, IS-C
-99999999
~
99999999
Arc radius
Relevant to IS-B, IS-C
1
~
99999
Tool retraction in G71, G72
Relevant to IS-B, IS-C
1
~
9999 (times)
Roughing cycle times in G73
1
~
99999
Tool retraction clearance in G74,
G75
Relevant to IS-B, IS-C
1
~
99999
Tool retraction clearance from end
point in G74, G75
Relevant to IS-B, IS-C
1
~
99999999
Finishing allowance in G76
Relevant to IS-B, IS-C
R
-99999999
~
99999999
Taper in G90, G92, G94, G96
Relevant to IS-B, IS-C
-99999999
~
99999999
X vector between arc center and
starting point
Relevant to IS-B, IS-C
I
0.06
~
25400
(
tooth/inch
)
Metric thread teeth
K
-99999999
~
99999999
Z vector between arc center and
starting point
Relevant to IS-B, IS-C