Daily Maintenance Procedures
Daily
Utilities
IMMAGE 800 Operations Manual A11403
Page 10-8
September 2016
Daily Maintenance Procedures
Daily
The following table lists the scheduled daily maintenance for the IMMAGE 800
System.
Observe and Check
As part of daily maintenance perform the following steps.
Table 10.2
Daily Maintenance
Check
Clean
Wash Volume and Tubings
Reagent and Sample Probes/Mixers
Waste Volume and Tubing
Fluid spills
Syringes: tubings, tips, and valves
Visual Maintenance
Visually confirm that
the...
is...
Wash Solution (1) volume
sufficient to perform the laboratory’s daily workload.
(Each box will perform approximately 1,000 tests.)
Blue
(Wash Solution)
tubing (2)
free of sharp bends or obstructions and is attached to
blue fitting. (Refer to Figure 10.1.)
Orange
(Wash Solution)
tubing (3)
free of sharp bends or obstructions and is attached to
orange fitting.
Green
waste tubing (4)
free of any sharp bends or obstructions and is routed to
the drain or waste container. If the waste is collected in
a waste container (5), decontaminate according to local
regulatory guidelines and empty as needed.