Overview
Introduction
IMMAGE 800 Operations Manual A11403
System Setup
September 2016
Page 5-117
5
Instrument Setup
Overview
Introduction
Some parts of the instrument hardware require a one-time setup prior to a sample run.
This section explains:
• Rack bar code label placement
• Wash solution box placement
• Waste container placement