Overview
Introduction
IMMAGE 800 Operations Manual A11403
Sample Programming
September 2016
Page 7-3
7
Preparing for Programming/Running
Overview
Introduction
Before programming samples and/or starting a run:
• all racks to be used must have a status of
Available
. If the status of a rack is not
Available
, the rack must be cleared before it can be used for programming samples.
• the dilution segments status should be checked. Segments can be cleared or left
unchanged.
• reagents, reaction buffers, and sample diluents should be checked.
• wash solution volume should be checked.