4 - 6
4. SIGNALS AND WIRING
(4) MR-J3-60T4 to MR-J3-200T4
EMG
P
N
D
C
U
V
W
U
V
W
2
3
4
1
M
CN2
24VDC
MCCB
CNP2
MC
ON
OFF
MC
SK
MC (Note 8)
(Note 1)
(Note 2)
Servo amplifier
CNP1
L
1
L
2
L
3
P
1
P
2
L
11
L
21
CN6
DOCOM
(Note 4)
ALM
DICOM
DOCOM
CN6
PE
CNP3
(Note 5)
RA
Malfunction
(Note 4)
Encoder
Motor
Servo motor
Malfunction
RA
(Note 6)
Stepdown
transformer
Forced stop
(Note 7)
3-phase
380 to
480VAC
(Note 3)
Encode cable
Forced stop
(Note 7)
Note 1. Always connect P
1
and P
2
. (Factory-wired.) When using the power factor improving DC reactor, refer to section 14.11.
2. Always connect P and D. (Factory-wired.) When using the regenerative option, refer to section 14.2.
3. For encoder cable, use of the option cable is recommended. Refer to section 14.1 for selection of the cable.
4. For the sink I/O interface. For the source I/O interface, refer to section 4.8.3.
5. Refer to section 4.10.
6. Stepdown transformer is required for coil voltage of magnetic contactor more than 200V class.
7. Configure the circuit which shuts off main circuit power with external sequence at forced stop (EMG) off.
8. Use a magnetic contactor with an operation delay time (interval between current being applied to the coil until closure of
contacts) of 80ms or less.
Summary of Contents for Melservo-J3 Series MR-J3-B
Page 19: ...10 MEMO ...
Page 55: ...1 36 1 FUNCTIONS AND CONFIGURATION MEMO ...
Page 61: ...2 6 2 INSTALLATION MEMO ...
Page 179: ...4 58 4 SIGNALS AND WIRING MEMO ...
Page 241: ...5 62 5 OPERATION MEMO ...
Page 357: ...10 16 10 SPECIAL ADJUSTMENT FUNCTIONS MEMO ...
Page 385: ...11 28 11 TROUBLESHOOTING MEMO ...
Page 397: ...12 12 12 OUTLINE DRAWINGS MEMO ...
Page 755: ...17 70 17 SPEED CONTROL OPERATION MEMO ...
Page 793: ...App 38 APPENDIX MEMO ...
Page 799: ...MEMO ...