1197
12
Log
ical
par
titio
ni
ng man
age
r
Virtual NIC (VNIC) assignment
The following are executed on the VNIC Assignment screen.
Assigns a VNIC to each LPAR.
Sets a VNIC device type to each LPAR.
Displays information on the VNIC selected by the cursor.
Sets the promiscuous mode to the VNIC selected by the cursor.
Changes the MAC address of the VNIC selected by the cursor.
Sets VLAN to the VNIC selected by the cursor.
Sets Inter-LPAR Packet Filtering to the VNIC selected by the cursor.
Displays the list of the promiscuous mode and VLAN settings to the VNIC
selected by the cursor.
The following table describes each item on the screen.
#
Title
Official
Name
Description
Initial Value
(When LPAR is
added)
(1) #
LPAR
Number
Displays LPAR numbers.
-
(2) Name
LPAR Name Displays the LPAR name.
NO_NAME
(3) Sta
Status
Displays the LPAR status.
Act (Activate): The LPAR is powered on.
Dea (Deactivate): The LPAR is powered off.
Fai (Failure): The LPAR cannot be used due to an
unrecoverable failure. Reboot LPAR manager when this
happens.
Dea
(4) #VNIC
Total number
of VNIC
Displays the number of VNICs assigned to LPARs.
0
+----------------------------------------------------(11) Error Event Detected --+
|+- Virtual NIC Assignment -----------------------------------------------------+|
|| ||
|| ||
|| (6)
Virtual NIC Number ||
|| # Name Sta #VNIC Device 0 1 2 3 4 5 6 7 8 9 ||
|| 1 LPAR1 Dea 2 NIC1 1a 1b * * * * * * * * ||
|| 2 LPAR2 Dea 0 NIC1 * * * * * * * * * * ||
|| 3 LPAR3 Dea 0 NIC1 * * * * * * * * * * ||
|| 4 LPAR4 Dea 0 NIC1 * * * * * * * * * * ||
|| 5 (2) (3) (4) (5) (7) ||
|| 6 ||
|| 7 ||
|| 8 ||
|| 9 ||
|| 10 ||
|| (1) (8) [PageUp]:Page Up / [PageDown]:Page Down ||
|+------------------------------------------------------------------------------+
|
|(9) VNIC Information-----------------------------------------------------------+|
|| No: 0 MAC Address: 00.00.87.62.f7.00 Shared NIC#: 1 Tag: Undef Prm: T ||
|| Inter-LPAR Packet Filtering: Disable ||
|| VLANID: ||
++-----------------------------------------------------------------------------
++
|(10)F2:Disp F5:Set Prom. Mode F6:Change MAC Addr F7:Select VLAN |
| F8:Packet Filter F11:Left F12:Right Esc:Menu |
+------------------------------------------------------------------------------
-+
Summary of Contents for Compute Blade 2000
Page 1: ...MK 99BDS2K001 16 Hitachi Compute Blade 2000 User s Guide ...
Page 42: ...xlii Precautions for Safe Use Rear View of A1 A2 Chassis ...
Page 43: ...xliii Precautions for Safe Use Rear View of A2 Chassis ...
Page 44: ...xliv Precautions for Safe Use Server Blade ...
Page 45: ...xlv Precautions for Safe Use I O Slot Expansion Unit ...
Page 46: ...xlvi Precautions for Safe Use I O Module ...
Page 47: ...xlvii Precautions for Safe Use AC Power Input Module ...
Page 51: ...li How to Use the Manuals This page is intentionally left blank ...
Page 61: ...10 1 Before Use ...
Page 64: ...13 2 How to Use the System Equipment Rear view of A1 chassis Rear view of A2 chassis ...
Page 93: ...42 2 How to Use the System Equipment ...
Page 123: ...72 3 Connecting the System Equipment and Powering On ...
Page 272: ...221 5 Server Blade Setup 3 Check Del and click Go The following screen appears 4 Click Yes ...
Page 345: ...294 5 Server Blade Setup 12 Click Next The following screen appears ...
Page 351: ...300 5 Server Blade Setup 3 Check Delete and click Go The following screen appears 4 Click Yes ...
Page 426: ...375 5 Server Blade Setup 3 Check Delete and click Go The following screen appears 4 Click Yes ...
Page 430: ...379 5 Server Blade Setup 3 Click Go Hotspare is set to the specified hard disk ...
Page 479: ...428 5 Server Blade Setup ...
Page 717: ...666 6 Management Module Settings Details of a physical partition ...
Page 722: ...671 6 Management Module Settings Server blade details view ...
Page 723: ...672 6 Management Module Settings ...
Page 732: ...681 6 Management Module Settings Management module details view ...
Page 745: ...694 6 Management Module Settings Optional Physical WWN list view ...
Page 748: ...697 6 Management Module Settings Optional Physical WWN initialization view ...
Page 751: ...700 6 Management Module Settings ...
Page 754: ...703 6 Management Module Settings Power status details view ...
Page 767: ...716 6 Management Module Settings ...
Page 768: ...717 6 Management Module Settings ...
Page 769: ...718 6 Management Module Settings ...
Page 814: ...763 6 Management Module Settings Power status trend view partition ...
Page 817: ...766 6 Management Module Settings Access log display view ...
Page 819: ...768 6 Management Module Settings WWN change log display view ...
Page 879: ...828 7 Configuring the LAN Switch Module Link aggregation adding editing screen ...
Page 899: ...848 8 Configuring the 10 Gb DCB Switch Module ...
Page 919: ...868 10 Configuring the Fibre Channel Switch Module ...
Page 1535: ...1484 12 Logical partitioning manager ...
Page 1877: ...1826 14 14 When You Need Help ...
Page 1925: ...16 Glossary ...