1560
1
3
S
yst
em
O
p
er
at
ion and Man
agem
ent
(4) Executing the e-mailing test
Execute the e-mailing test using e-mail notification by manual operation (the
current status).
Select
e-mail notification > Operation > E-mail notification by manual
operation (management LAN)
to execute the test.
Select the destination address from the list. You can select a specific
address or all addresses.
An inquiry to confirm the e-mail notification, execute it if no problem.
Logs are collected and then the e-mail notification is executed. Confirm
that the e-mail has reached to the destination address.
Collecting logs takes a few minutes.
E-mail notification is to finish when the e-mail has
been properly transmitted to the mail server.
When the e-mail is sent to multiple destinations in the
test, the email may fail to reach all destinations even if
it fails to reach one destination fails.
If the mailing test fails, review the environment and
settings referring to the following description and
correct them as necessary.
Check if communication between the
management module and the mail server is
available.
- If not, check that the LAN cable is properly
connected.
- Check the network setting of the management
module.
- You need to specify DNS in the network setting
of the management module when specifying the
mail server as the host name.
Check if the SMTP service is running on the
SMTP server.
Check if the basic information and destination
information are properly configured.
The following table describes messages showing results from e-mail notification
triggered by manual operation.
Message
Description
The operation for e-mail address % was successful.
Description: The e-mail notification was successfully sent.
Checking and Action: None.
The operation for e-mail address % failed. The IP address could not be resolved from
the host name.
Description: Failed to obtain an IP address name from the SMTP host name.
Checking and Action: Check the e-mail notification setting (SMTP). Check the network
setting (DNS: domain name system). Check the connection to LAN.
The operation for e-mail address % failed. The format of the IP address is invalid.
Summary of Contents for Compute Blade 2000
Page 1: ...MK 99BDS2K001 16 Hitachi Compute Blade 2000 User s Guide ...
Page 42: ...xlii Precautions for Safe Use Rear View of A1 A2 Chassis ...
Page 43: ...xliii Precautions for Safe Use Rear View of A2 Chassis ...
Page 44: ...xliv Precautions for Safe Use Server Blade ...
Page 45: ...xlv Precautions for Safe Use I O Slot Expansion Unit ...
Page 46: ...xlvi Precautions for Safe Use I O Module ...
Page 47: ...xlvii Precautions for Safe Use AC Power Input Module ...
Page 51: ...li How to Use the Manuals This page is intentionally left blank ...
Page 61: ...10 1 Before Use ...
Page 64: ...13 2 How to Use the System Equipment Rear view of A1 chassis Rear view of A2 chassis ...
Page 93: ...42 2 How to Use the System Equipment ...
Page 123: ...72 3 Connecting the System Equipment and Powering On ...
Page 272: ...221 5 Server Blade Setup 3 Check Del and click Go The following screen appears 4 Click Yes ...
Page 345: ...294 5 Server Blade Setup 12 Click Next The following screen appears ...
Page 351: ...300 5 Server Blade Setup 3 Check Delete and click Go The following screen appears 4 Click Yes ...
Page 426: ...375 5 Server Blade Setup 3 Check Delete and click Go The following screen appears 4 Click Yes ...
Page 430: ...379 5 Server Blade Setup 3 Click Go Hotspare is set to the specified hard disk ...
Page 479: ...428 5 Server Blade Setup ...
Page 717: ...666 6 Management Module Settings Details of a physical partition ...
Page 722: ...671 6 Management Module Settings Server blade details view ...
Page 723: ...672 6 Management Module Settings ...
Page 732: ...681 6 Management Module Settings Management module details view ...
Page 745: ...694 6 Management Module Settings Optional Physical WWN list view ...
Page 748: ...697 6 Management Module Settings Optional Physical WWN initialization view ...
Page 751: ...700 6 Management Module Settings ...
Page 754: ...703 6 Management Module Settings Power status details view ...
Page 767: ...716 6 Management Module Settings ...
Page 768: ...717 6 Management Module Settings ...
Page 769: ...718 6 Management Module Settings ...
Page 814: ...763 6 Management Module Settings Power status trend view partition ...
Page 817: ...766 6 Management Module Settings Access log display view ...
Page 819: ...768 6 Management Module Settings WWN change log display view ...
Page 879: ...828 7 Configuring the LAN Switch Module Link aggregation adding editing screen ...
Page 899: ...848 8 Configuring the 10 Gb DCB Switch Module ...
Page 919: ...868 10 Configuring the Fibre Channel Switch Module ...
Page 1535: ...1484 12 Logical partitioning manager ...
Page 1877: ...1826 14 14 When You Need Help ...
Page 1925: ...16 Glossary ...