173
5
Server B
lad
e S
etup
This operation only gives a command to start
hardware memory dump. Then the server blade
Web console responds and returns to the Power
and LEDs screen before the dump is complete.
To check the dump progress, use the OS console
to the target server blade for X55R3/X55S3
models; use the remote console to the target
server blade for other models.
3
Check the progress and completion of the hardware memory dump.
When the hardware memory dump is started, the following screen is displayed
in the remote console or OS console.
The following is a rough estimated time required for a dump:
About 4 minutes per 2 GB dump file size.
Required time for dump depends on the write performance of the storage.
When the dump is successfully completed, “hardware dump complete” is
displayed. After the dump is complete, the operation set in
Post process
of
the EFI setup menu is executed.
When the dump partition does not have enough free
space for the dump file, a message appears and the
dump is stopped when free space runs out.
Once the dump is stopped, it cannot be resumed.
If hardware memory dump process has aborted, data
on the dumped images might be corrupted.
When executed in the virtual environment, hardware
memory dump may not work properly. Check system
event logs about whether hardware memory dump
has been executed or not. If “IPMI WDT Timeout
(BIOS)” is displayed after “Issue INIT for
HardwareDump” or if “HardwareDump Start” is not
displayed in the system event log, the hardware
memory dump might not have worked properly.
Summary of Contents for Compute Blade 2000
Page 1: ...MK 99BDS2K001 16 Hitachi Compute Blade 2000 User s Guide ...
Page 42: ...xlii Precautions for Safe Use Rear View of A1 A2 Chassis ...
Page 43: ...xliii Precautions for Safe Use Rear View of A2 Chassis ...
Page 44: ...xliv Precautions for Safe Use Server Blade ...
Page 45: ...xlv Precautions for Safe Use I O Slot Expansion Unit ...
Page 46: ...xlvi Precautions for Safe Use I O Module ...
Page 47: ...xlvii Precautions for Safe Use AC Power Input Module ...
Page 51: ...li How to Use the Manuals This page is intentionally left blank ...
Page 61: ...10 1 Before Use ...
Page 64: ...13 2 How to Use the System Equipment Rear view of A1 chassis Rear view of A2 chassis ...
Page 93: ...42 2 How to Use the System Equipment ...
Page 123: ...72 3 Connecting the System Equipment and Powering On ...
Page 272: ...221 5 Server Blade Setup 3 Check Del and click Go The following screen appears 4 Click Yes ...
Page 345: ...294 5 Server Blade Setup 12 Click Next The following screen appears ...
Page 351: ...300 5 Server Blade Setup 3 Check Delete and click Go The following screen appears 4 Click Yes ...
Page 426: ...375 5 Server Blade Setup 3 Check Delete and click Go The following screen appears 4 Click Yes ...
Page 430: ...379 5 Server Blade Setup 3 Click Go Hotspare is set to the specified hard disk ...
Page 479: ...428 5 Server Blade Setup ...
Page 717: ...666 6 Management Module Settings Details of a physical partition ...
Page 722: ...671 6 Management Module Settings Server blade details view ...
Page 723: ...672 6 Management Module Settings ...
Page 732: ...681 6 Management Module Settings Management module details view ...
Page 745: ...694 6 Management Module Settings Optional Physical WWN list view ...
Page 748: ...697 6 Management Module Settings Optional Physical WWN initialization view ...
Page 751: ...700 6 Management Module Settings ...
Page 754: ...703 6 Management Module Settings Power status details view ...
Page 767: ...716 6 Management Module Settings ...
Page 768: ...717 6 Management Module Settings ...
Page 769: ...718 6 Management Module Settings ...
Page 814: ...763 6 Management Module Settings Power status trend view partition ...
Page 817: ...766 6 Management Module Settings Access log display view ...
Page 819: ...768 6 Management Module Settings WWN change log display view ...
Page 879: ...828 7 Configuring the LAN Switch Module Link aggregation adding editing screen ...
Page 899: ...848 8 Configuring the 10 Gb DCB Switch Module ...
Page 919: ...868 10 Configuring the Fibre Channel Switch Module ...
Page 1535: ...1484 12 Logical partitioning manager ...
Page 1877: ...1826 14 14 When You Need Help ...
Page 1925: ...16 Glossary ...