1295
12
Log
ical
par
titio
ni
ng man
age
r
(3) VF NIC
With LPAR manager, you can enable SR-IOV function of physical NICs and set a
network segment for VF NIC to a physical LAN controller in shared mode. Defining
connection between the network segment and VF NIC allows communication with
external networks. Network segments can be set on the
Communication is available between VF NICs connected to the same network
segment without using external network. VF NICs connected to different network
segments require an external network for communication.
Up to two physical LAN controllers can be assigned to LPAR manager.
The following table describes relation between the number of Shared NICs and
network segment identifiers.
Shared NIC number
Port number
Network segment identifier
1
0
1av
1
1bv
……
2
0
2av
1
2bv
In the figure above, communication between Shared NIC #0 of LPAR1 assigned to
Segment 1av and Shared NIC #1 of LPAR2 assigned to Segment 1bv or Shared
NIC #2 of LPAR2 assigned to Segment 2av requires external networks.
LPAR2
VF NIC
Virtual network
LPAR manager
LPAR1
VF NIC
Segment 1av
Segment 1bv
External network
Port0
Physical NIC#1
#0 #1
#0 #1
Port1
Segment 2av
Port0
#2
#2
Physical NIC#2
With VF NIC function,
NIC virtualized from
physical NIC can be
assigned to an LPAR
defined on LPAR
manager.
Summary of Contents for Compute Blade 2000
Page 1: ...MK 99BDS2K001 16 Hitachi Compute Blade 2000 User s Guide ...
Page 42: ...xlii Precautions for Safe Use Rear View of A1 A2 Chassis ...
Page 43: ...xliii Precautions for Safe Use Rear View of A2 Chassis ...
Page 44: ...xliv Precautions for Safe Use Server Blade ...
Page 45: ...xlv Precautions for Safe Use I O Slot Expansion Unit ...
Page 46: ...xlvi Precautions for Safe Use I O Module ...
Page 47: ...xlvii Precautions for Safe Use AC Power Input Module ...
Page 51: ...li How to Use the Manuals This page is intentionally left blank ...
Page 61: ...10 1 Before Use ...
Page 64: ...13 2 How to Use the System Equipment Rear view of A1 chassis Rear view of A2 chassis ...
Page 93: ...42 2 How to Use the System Equipment ...
Page 123: ...72 3 Connecting the System Equipment and Powering On ...
Page 272: ...221 5 Server Blade Setup 3 Check Del and click Go The following screen appears 4 Click Yes ...
Page 345: ...294 5 Server Blade Setup 12 Click Next The following screen appears ...
Page 351: ...300 5 Server Blade Setup 3 Check Delete and click Go The following screen appears 4 Click Yes ...
Page 426: ...375 5 Server Blade Setup 3 Check Delete and click Go The following screen appears 4 Click Yes ...
Page 430: ...379 5 Server Blade Setup 3 Click Go Hotspare is set to the specified hard disk ...
Page 479: ...428 5 Server Blade Setup ...
Page 717: ...666 6 Management Module Settings Details of a physical partition ...
Page 722: ...671 6 Management Module Settings Server blade details view ...
Page 723: ...672 6 Management Module Settings ...
Page 732: ...681 6 Management Module Settings Management module details view ...
Page 745: ...694 6 Management Module Settings Optional Physical WWN list view ...
Page 748: ...697 6 Management Module Settings Optional Physical WWN initialization view ...
Page 751: ...700 6 Management Module Settings ...
Page 754: ...703 6 Management Module Settings Power status details view ...
Page 767: ...716 6 Management Module Settings ...
Page 768: ...717 6 Management Module Settings ...
Page 769: ...718 6 Management Module Settings ...
Page 814: ...763 6 Management Module Settings Power status trend view partition ...
Page 817: ...766 6 Management Module Settings Access log display view ...
Page 819: ...768 6 Management Module Settings WWN change log display view ...
Page 879: ...828 7 Configuring the LAN Switch Module Link aggregation adding editing screen ...
Page 899: ...848 8 Configuring the 10 Gb DCB Switch Module ...
Page 919: ...868 10 Configuring the Fibre Channel Switch Module ...
Page 1535: ...1484 12 Logical partitioning manager ...
Page 1877: ...1826 14 14 When You Need Help ...
Page 1925: ...16 Glossary ...