
06/16 Rev. 04
SERVICE MANUAL
Service Electronics Gen. 3
64-xx Gen. 3 – DPM Gen. 3 – PEM – ALX 92x Gen. 3 – ALX 73x (PMA)
62
Connecting the OD-sensor to
USI
Also see topic section
, chap-
ter „USI board“.
Tools
• 2mm allen key
• Size 5 socket wrench
Preparing the USI board
1. Disconnect and dismantle the USI board
2. Disconnect the third connected jumper
3. Unscrew board plate [49A]. To do this
unscrew the two screws [49B].
Wire colour Function
Brown
+24 V
A
Blue
GND
Black
K
[Tab. 6]
Pin assignment at the OD-sensor cable.
[48] OD-sensor assy. for USI (A3523).
[49] USI board
A
B
C
C
A
B
Summary of Contents for ALX 92x
Page 3: ...Release 3 6 2016 SERVICE MANUAL ALX 92x Print Apply system ...
Page 356: ...12 14 Rev 05 SERVICE MANUAL Service Electronics 64 xx Gen 2 DPM Gen 2 ALX 92x Gen 2 43 ...
Page 508: ...Edition 1 3 2016 INSTALLATION MANUAL AI retrofitting kit for ALX 92x ...
Page 509: ......
Page 511: ...Installation Manual AI retrofitting kit for ALX 92x 03 2016 4 Content ...
Page 520: ...Installation Manual AI retrofitting kit for ALX 92x 03 2016 00 13 Installation ...
Page 521: ......
Page 522: ...Novexx Solutions GmbH Ohmstraße 3 85386 Eching Germany 49 8165 925 0 www novexx com ...