12 - 10
MELSEC-Q
12 CONTROL SUB FUNCTIONS
(2) OP shift operation at the "
Pr.47
Creep speed"
(When "
Pr.56
Speed designation during OP shift" is 1)
When the " Pr. 53 OP
shift amount" is negative
When the " Pr. 53 OP
shift amount" is positive
Pr. 44 OPR
direction
Zero point
Machine OPR start
Near-point dog
Zero signal
OP
Pr. 47 Creep
speed
Fig. 12.7 OP shift operation at the creep speed
[4] Control Precautions
(1) The following data are set after the OP shift amount is complete.
•
OPR complete flag ("
Md.31
Status: b4)
•
Md.20
Current feed value
•
Md.21
Machine feed value
•
Md.26
Axis operation status
OPR request flag (
Md.31
Status: b3) is reset after completion of the OP
shift.
(2) "
Pr.53
OP shift amount" is not added to "
Md.34
Movement amount after
near-point dog ON". The movement amount immediately before the OP shift
operation, considering near-point dog ON as "0", is stored. For the stopper
method (1) 2) 3)), the movement amount is not changed from "0".
(3) When using the OP shift function with the stopper method (1) 2) 3)) selected
for the OPR method, configure the OP shift operation in the opposite
direction of the OPR direction.
It cannot shift to the OPR direction due to a mechanical stopper in the OPR
direction.
[5] Setting method
To use the "OP shift function", set the required details in the parameters shown in
the following table, and write them to the QD75.
When the parameters are set, the OP shift function will be added to the machine
OPR control. The set details are validated at the rising edge (OFF ON) of the
PLC READY signal (Y0).
Setting item
Setting
value
Setting details
Factory-set
initial value
Pr.53
OP shift amount
Set the shift amount during the OP shift.
0
Pr.56
Speed
designation
during OP shift
Select the speed during the OP shift
0:
Pr.46
OPR speed
1:
Pr.47
Creep speed
0
Refer to Section 5.2 "List of parameters" for setting details.
Summary of Contents for Melsec-Q QD75D1
Page 1: ......
Page 2: ......
Page 22: ...A 20 MEMO ...
Page 24: ...MEMO ...
Page 41: ...1 17 MELSEC Q 1 PRODUCT OUTLINE MEMO ...
Page 48: ...1 24 MELSEC Q 1 PRODUCT OUTLINE MEMO ...
Page 60: ...2 12 MELSEC Q 2 SYSTEM CONFIGURATION MEMO ...
Page 137: ...5 33 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 232: ...5 128 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 252: ...6 20 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL ...
Page 253: ...6 21 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL ...
Page 278: ...6 46 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL MEMO ...
Page 292: ...MEMO ...
Page 436: ...9 120 MELSEC Q 9 MAJOR POSITIONING CONTROL MEMO ...
Page 464: ...10 28 MELSEC Q 10 HIGH LEVEL POSITIONING CONTROL MEMO ...
Page 638: ...14 24 MELSEC Q 14 DEDICATED INSTRUCTIONS MEMO ...
Page 647: ...15 9 MELSEC Q 15 TROUBLESHOOTING MEMO ...
Page 686: ...15 48 MELSEC Q 15 TROUBLESHOOTING MEMO ...
Page 839: ...Appendix 153 MELSEC Q APPENDICES 6 QD75D4N 90 23 27 4 12 98 4 46 Unit mm ...
Page 840: ...Appendix 154 MELSEC Q APPENDICES 7 QD75P1 QD75P2 QD75P4 27 4 23 98 90 4 46 unit mm ...