Index - 7
OP shift function ............................................ 12-8
OP shift function (Explanation of positioning terms)
........................................................ Appendix-126
Operating principle .......................................... 1-8
Operation pattern (
Da.1
)............................ 5-57
Operation pattern (Explanation of positioning
terms).............................................. Appendix-126
Operation patterns........................................... 9-5
Operation timing and processing time during
position-speed switching control................. 9-105
Operation timing and processing time during
speed-position switching control (ABS mode)
....................................................................... 9-99
Operation timing and processing time during
speed-position switching control (INC mode)
....................................................................... 9-90
Operation timing and processing time of fast OPR
....................................................................... 8-24
OPR acceleration time selection (
Pr.51
).. 5-51
OPR basic parameters.................................. 5-43
OPR complete flag ........................................ 5-96
OPR deceleration time selection (
Pr.52
).. 5-51
OPR detailed parameters ............................. 5-50
OPR direction (
Pr.44
) ............................... 5-46
OPR dwell time (
Pr.49
)............................. 5-50
OPR method.................................................... 8-5
OPR method (
Pr.43
) ................................. 5-43
OPR method (1): Near-point dog method ...... 8-7
OPR method (2): Stopper method 1) ............. 8-9
OPR method (3): Stopper method 2) ........... 8-12
OPR method (4): Stopper method 3) ........... 8-15
OPR method (5): Count method 1) .............. 8-17
OPR method (6): Count method 2) .............. 8-20
OPR method (Explanation of positioning terms)
........................................................ Appendix-126
OPR parameter (Explanation of positioning terms)
........................................................ Appendix-127
OPR request.................................................... 8-2
OPR request (Explanation of positioning terms)
........................................................ Appendix-127
OPR request flag........................................... 5-96
OPR request flag OFF request (
Cd.19
)
..................................................................... 5-120
OPR request OFF program .......................... 6-24
OPR retry (
Pr.48
) ...................................... 5-49
OPR retry function .........................................12-4
OPR speed (
Pr.46
)....................................5-47
OPR torque limit value (
Pr.54
) ..................5-53
Order of priority for stop process...................6-45
Outline design of positioning system...............1-9
Outline of installation, wiring and maintenance
..........................................................................4-2
Outline of OPR control.....................................8-2
Outline of restarting........................................1-22
Outline of starting...........................................1-18
Outline of stopping.........................................1-20
Output signal logic selection (
Pr.23
) .........5-32
Output terminal (Explanation of positioning terms)
........................................................ Appendix-127
Output timing selection of near pass control
......................................................................12-22
Override function..........................................12-47
Override function (Explanation of positioning
terms) ............................................. Appendix-127
Override program...........................................6-20
[P]
P rate (Explanation of positioning terms)
........................................................ Appendix-127
Parameter (
Da.14
)......................................5-73
Parameter (Explanation of positioning terms)
........................................................ Appendix-127
Parameter 1 (
Da.18
)...................................5-79
Parameter 2 ( Da.19 ) ...................................5-79
Parameter area ................................................7-3
Parameter initialization program....................6-22
Parameter initialization request (
Cd.2
) ....5-104
Parameter setting..............................Appendix-73
Performance specifications .............................3-2
Peripheral device .......................................... A-17
Personal computer........................................ A-17
PG0 (Explanation of positioning terms)
........................................................ Appendix-127
PLC CPU memo area......................................7-3
PLC READY signal ........................................3-17
PLC READY signal [Y0] ON program...........6-17
Position control (Explanation of positioning terms)
........................................................ Appendix-127
Position detection module (Explanation of
positioning terms)........................... Appendix-128
Summary of Contents for Melsec-Q QD75D1
Page 1: ......
Page 2: ......
Page 22: ...A 20 MEMO ...
Page 24: ...MEMO ...
Page 41: ...1 17 MELSEC Q 1 PRODUCT OUTLINE MEMO ...
Page 48: ...1 24 MELSEC Q 1 PRODUCT OUTLINE MEMO ...
Page 60: ...2 12 MELSEC Q 2 SYSTEM CONFIGURATION MEMO ...
Page 137: ...5 33 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 232: ...5 128 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 252: ...6 20 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL ...
Page 253: ...6 21 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL ...
Page 278: ...6 46 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL MEMO ...
Page 292: ...MEMO ...
Page 436: ...9 120 MELSEC Q 9 MAJOR POSITIONING CONTROL MEMO ...
Page 464: ...10 28 MELSEC Q 10 HIGH LEVEL POSITIONING CONTROL MEMO ...
Page 638: ...14 24 MELSEC Q 14 DEDICATED INSTRUCTIONS MEMO ...
Page 647: ...15 9 MELSEC Q 15 TROUBLESHOOTING MEMO ...
Page 686: ...15 48 MELSEC Q 15 TROUBLESHOOTING MEMO ...
Page 839: ...Appendix 153 MELSEC Q APPENDICES 6 QD75D4N 90 23 27 4 12 98 4 46 Unit mm ...
Page 840: ...Appendix 154 MELSEC Q APPENDICES 7 QD75P1 QD75P2 QD75P4 27 4 23 98 90 4 46 unit mm ...
Page 841: ...Appendix 155 MELSEC Q APPENDICES 8 QD75D1 QD75D2 QD75D4 27 4 23 90 12 98 4 46 unit mm ...
Page 842: ...Appendix 156 MELSEC Q APPENDICES MEMO ...
Page 857: ......
Page 858: ......