1 - 18
MELSEC-Q
1 PRODUCT OUTLINE
1.2.2 Outline of starting
The outline for starting each control is shown with the following flowchart.
It is assumed that each module is installed, and the required system configuration,
etc., has been prepared.
Flow of starting
Preparation
Installation and connection of module
Setting of hardware
Control
functions
Major position-
ing control
•Block start (Normal start)
•Condition start
•Wait start
•Simultaneous start
•Repeated start
•Machine OPR control
•Fast OPR control
•JOG operation
•Manual pulse generator operation
Positioning
parameters
Set the OPR parameters.
Positioning
data
Set the positioning data.
Set the block start
data.
Control data
Set the positioning
starting point No.
Set the manual pulse
generator enable flag to "1".
Set the manual pulse generator
1 pulse input magnification.
Input the start signal.
Method (2) Issue the Z.PSTRT instruction from the CPU module
Method (3) Turn the QD75 external start signal ON
Operate the
manual pulse
generator
Control start
Control end
Operation
Stop
Set the positioning parameters.
to ,
)
Pr.1
Pr.42
)
Pr.150
to
)
Da.1
)
Da.10
to
)
Pr.43
)
Pr.57
to
)
Da.11
)
Da.19
)
)
Cd.3
)
)
Cd.4
)
)
Cd.17
)
)
Cd.21
)
)
Cd.20
•Inching operation
)
)
Cd.16
Set the inching
movement amount
to other than 0.
)
)
Cd.16
Set the inching
movement
amount to 0.
OPR parameters
Block start data
Set the positioning start No.
Start signal
Method (1) Turn ON the QD75 start signal from the
CPU module
Turn the QD75 JOG start signal
ON from the CPU module
•Position control
•Speed control
•Speed-position
switching control
•Position-speed
switching control
•Other control
High-level positioning
control
OPR control
•Machine OPR control
Manual control
•Manual pulse generator operation
Set the JOG speed.
Summary of Contents for Melsec-Q QD75D1
Page 1: ......
Page 2: ......
Page 22: ...A 20 MEMO ...
Page 24: ...MEMO ...
Page 41: ...1 17 MELSEC Q 1 PRODUCT OUTLINE MEMO ...
Page 48: ...1 24 MELSEC Q 1 PRODUCT OUTLINE MEMO ...
Page 60: ...2 12 MELSEC Q 2 SYSTEM CONFIGURATION MEMO ...
Page 137: ...5 33 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 232: ...5 128 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 252: ...6 20 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL ...
Page 253: ...6 21 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL ...
Page 278: ...6 46 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL MEMO ...
Page 292: ...MEMO ...
Page 436: ...9 120 MELSEC Q 9 MAJOR POSITIONING CONTROL MEMO ...
Page 464: ...10 28 MELSEC Q 10 HIGH LEVEL POSITIONING CONTROL MEMO ...
Page 638: ...14 24 MELSEC Q 14 DEDICATED INSTRUCTIONS MEMO ...
Page 647: ...15 9 MELSEC Q 15 TROUBLESHOOTING MEMO ...
Page 686: ...15 48 MELSEC Q 15 TROUBLESHOOTING MEMO ...
Page 839: ...Appendix 153 MELSEC Q APPENDICES 6 QD75D4N 90 23 27 4 12 98 4 46 Unit mm ...
Page 840: ...Appendix 154 MELSEC Q APPENDICES 7 QD75P1 QD75P2 QD75P4 27 4 23 98 90 4 46 unit mm ...
Page 841: ...Appendix 155 MELSEC Q APPENDICES 8 QD75D1 QD75D2 QD75D4 27 4 23 90 12 98 4 46 unit mm ...
Page 842: ...Appendix 156 MELSEC Q APPENDICES MEMO ...
Page 857: ......
Page 858: ......