11 - 19
MELSEC-Q
11 MANUAL CONTROL
11.3.2 Inching operation execution procedure
The inching operation is carried out by the following procedure.
STEP 1
Preparation
Refer to
CHAPTER 5 and
Section 11.3.3.
End of control
Set the parameters.
STEP 2
Refer to Section
11.3.4.
STEP 3
Write the sequence program created in STEP 1 and
Turn ON the JOG start signal.
STEP 4
One of the following two methods can be used.
<Method 1>
Monitor using GX Configurator-QP.
<Method 2>
<Method 1>
Directly set (write) the parameters in the QD75 using GX
Configurator-QP.
<Method 2>
Set (write) the parameters from the CPU module to the QD75 using
the sequence program (TO instruction).
STEP 5
instruction.)
operation.
Write the sequence program to the CPU module.
Turn ON the JOG start signal of the axis to be started.
Monitoring of the
inching operation
STEP 6
Turn OFF the JOG operation start signal that is ON.
Monitor the inching operation status.
Forward run JOG start signal
Axis 1
Y8
Y9
YA
YB
YC
YD
Refer to
CHAPTER 6.
Axis 3
Axis 2
Inching operation
start
Inching operation
stop
to
)
Pr.1
)
Pr.31
Set the " Cd.16 inching movement amount".
(Control data setting)
YE
YF
Axis 4
End the inching operation after moving a workpiece
by an inching movement amount with the sequence
program created in STEP 2.
Create a sequence program in which the "JOG start
signal" is turned ON by an inching operation start
command.
One of the following two methods can be used.
Using GX Developer, set the control data and create a
sequence program for executing the inching
(Set the control data in the QD75 buffer memory using the TO
STEP 2 to the CPU module using GX Developer.
Reverse run JOG start signal
Monitor using GX Developer.
REMARK
•
Mechanical elements such as limit switches are considered as already installed.
•
Parameter settings work in common for all control using the QD75.
Summary of Contents for Melsec-Q QD75D1
Page 1: ......
Page 2: ......
Page 22: ...A 20 MEMO ...
Page 24: ...MEMO ...
Page 41: ...1 17 MELSEC Q 1 PRODUCT OUTLINE MEMO ...
Page 48: ...1 24 MELSEC Q 1 PRODUCT OUTLINE MEMO ...
Page 60: ...2 12 MELSEC Q 2 SYSTEM CONFIGURATION MEMO ...
Page 137: ...5 33 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 232: ...5 128 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 252: ...6 20 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL ...
Page 253: ...6 21 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL ...
Page 278: ...6 46 MELSEC Q 6 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL MEMO ...
Page 292: ...MEMO ...
Page 436: ...9 120 MELSEC Q 9 MAJOR POSITIONING CONTROL MEMO ...
Page 464: ...10 28 MELSEC Q 10 HIGH LEVEL POSITIONING CONTROL MEMO ...
Page 638: ...14 24 MELSEC Q 14 DEDICATED INSTRUCTIONS MEMO ...
Page 647: ...15 9 MELSEC Q 15 TROUBLESHOOTING MEMO ...
Page 686: ...15 48 MELSEC Q 15 TROUBLESHOOTING MEMO ...
Page 839: ...Appendix 153 MELSEC Q APPENDICES 6 QD75D4N 90 23 27 4 12 98 4 46 Unit mm ...
Page 840: ...Appendix 154 MELSEC Q APPENDICES 7 QD75P1 QD75P2 QD75P4 27 4 23 98 90 4 46 unit mm ...
Page 841: ...Appendix 155 MELSEC Q APPENDICES 8 QD75D1 QD75D2 QD75D4 27 4 23 90 12 98 4 46 unit mm ...
Page 842: ...Appendix 156 MELSEC Q APPENDICES MEMO ...
Page 857: ......
Page 858: ......